|
|
|
11-30-2007
An entertainment being built |
|
|
|
11-30-2007
Another view of the entertainment with the crown being removed and it being preped for sanding. |
|
|
|
11-30-2007
Parts to a desk drying and waiting to be assembled. |
|
|
|
11-30-2007
A Locker Murphy bed with graphics being applied. |
|
|
|
11-30-2007
A custom boat bed. Notice the all pine headboard on this one. |
|
|
|
|
11-29-2007
An oak kitchen. Yes, we do everything. |
|
|
|
11-29-2007
Another view of some oak cabinets. |
|
|
|
11-23-2007
A cherry murphy bed ready to go out |
|
|
|
11-21-2007
A completed boat bed. |
|
|
|
11-21-2007
A cherry Murphy bed waiting to be assembled. |
|
|
|
|
11-21-2007
A pair of bookcase for a locker murphy bed. |
|
|
|
11-19-2007
Zirkle's drawers for their boat. |
|
|
|
11-19-2007
The headboard for Zirkle's bed. |
|
|
|
11-19-2007
The toy box lid for Zirkle's boat. |
|
|
|
11-19-2007
The headboard for Zirkle's boat. |
|
|
|
|
11-19-2007
The bow for Zirkle's boat bed ready to be sanded. |
|
|
|
11-19-2007
Zirkle's boat bed being gluded up. |
|
|
|
11-19-2007
A custom armoire/chest. |
|
|
|
11-19-2007
A bookcase headboard for a captian's bed. |
|
|
|
11-14-2007
A pirate boat. A little different the our normal one |
|
|
|
|
11-14-2007
The pirate bed shown with the trundle open. |
|
|
|
11-14-2007
The pirate, I mean the builder. |
|
|
|
11-14-2007
A Excalibur Murphy bed ready to be picked up. |
|
|
|
11-08-2007
The case goods that match a boat bed. |
|
|
|
11-08-2007
Parts to an Excalbur Murphy bed. |
|
|
|
|
11-08-2007
The crown for the Murphy bed. |
|
|
|
11-08-2007
A couple of baseball beds. |
|
|
|
11-05-2007
2 boat beds and some case goods waiting to be finished out. |
|
|
|
11-02-2007
A custom entertainment center |
|
|
|
11-02-2007
The collum for the entertainment center. |
|
|